[Forgot Password]
Login  Register Subscribe

30481

 
 

423868

 
 

256148

 
 

909

 
 

199106

 
 

282

Paid content will be excluded from the download.


Download | Alert*
CCE
view XML

CCE-19844-0

Platform: ms-sql2005Date: (C)2013-02-19   (M)2022-10-10



Reporting Services scheduled events and report delivery should be enabled or disabled as appropriate.


Parameter:

(1) enable/disable


Technical Mechanism:

From Surface Area Configuration for Features: 1. Connect to the Report Services instance 2. Expand the instance 3. Expand Report Services 4. Select Scheduled events and report delivery 5. Click or do not click on the Scheduled events and report delivery check box 6. Click OK

CCSS Severity:CCSS Metrics:
CCSS Score : Attack Vector:
Exploit Score: Attack Complexity:
Impact Score: Privileges Required:
Severity: User Interaction:
Vector: Scope:
 Confidentiality:
 Integrity:
 Availability:
  

References:
Resource IdReference
DISA STIG SQL 2005 INS Version 8, Release 1.7 Benchmark Date: 27 August 2010Rule ID: V0015205 Rule Title: Reporting Services scheduled events and report delivery should be disabled if not required. STIG ID: DM6121 Severity: CAT III Class: Unclass


CPE    1
cpe:/a:microsoft:sql_server:2005

© SecPod Technologies